Taskforce-3


Train AIS (Aeronautical Information Service) officers for developing manuals of AIC, AIP & NOTAM.

Train FPD (Flight Procedure Designer) for designing Flight Procedures and draft AIP in UTDD.


Target / Beneficial CPs:

4 AIS Officers in UTDD

4 Flight Procedure Designers in UTDD

4 SAR/RCC Coordinators in TAN

 

Japanese Experts:

Mr. Atsushi Yamane (FPD Expert / Apr. 2017-)

Mr. Shinichiro Sukegawa (AIS Expert / Aug. 2017-)


Post Project Action Plan in 2019 for Renwaing FPD and AIP


AIS (NOTAM)/FPD/WGS-84/PBN + G/V and FPD-QA


 

 

Training in abroad (MAvA, GroupEAD and EUROCONTROL) by Project budget

 

Training or Technology Transfer (TA) by Japanese expert

 

 

TF-3

Overall

Goal

To improve Air Traffic Services (ATS) in Tajikistan.

Aeronautical Information Publication (AIP) has been updated in line with ICAO standards.

TF-3

Project

purpose

To enhance capacity of Tajikairnavigation (TAN) in Air Traffic Services (ATS).

The draft AIP of the model airport has been compliant with ICAO standards.

TF-3

Output

To enhance capacity of Aeronautical Information Services (AIS) officers with regard to ICAO recommendations.

Activities

3-1: To conduct basic training on AIS

3-2: To conduct basic training on aeronautical charts

3-3: To develop operation manuals for Notice to Airman(NOTAM), Aeronautical Information Circulars (AIC) and Aeronautical Information Publication (AIP)

3-4: To conduct basic training on flight procedure design

3-5: To conduct OJT of flight procedure designers for a model airport

3-6: To produce draft of AIP of the model airport

Indicators

3-1: 2 AIS officers have successfully completed basic course on AIS.

3-2: 2 AIS officers have successfully completed basic course on aeronautical charts.

3-3: Operation manuals for Notice to Airman (NOTAM), Aeronautical Information Circulars (AIC) and Aeronautical Information Publication (AIP) have been developed

3-4: 2 flight procedure designers have successfully completed basic course on PANS-OPS.

3-5: 2 flight procedure designers have successfully completed OJT on conventional flight procedure design.

3-6: Draft of Aeronautical Information Publication (AIP) of the model airport has been produced.